SAM4POS Touchscreen Systems

Help with a register you already own

You do not need to have bought the register from us.

We take paid remote support and programming work on SAM4S registers regardless of where the machine came from. That includes registers bought from another dealer, bought used, inherited with a business, or left without dealer support. Tell us the model and what is happening, and we will tell you honestly whether we can help remotely.

Start a support request

Support — something is not working

Choose support when the register is misbehaving and you need it diagnosed or corrected.

  • The register is not operating correctly
  • An error message or code needs diagnosing
  • A printer, cash drawer or peripheral is not responding
  • Questions about operating the register day to day
  • Working out whether hardware has actually failed

Programming — something needs changing

Choose programming when the register works but the configuration is wrong or out of date.

  • PLU or item changes
  • Department changes
  • Tax programming
  • Receipt header changes
  • Keyboard or menu changes
  • Larger register setup or configuration projects
Bought the register from SAM4sDirect or think you may already have support coverage? Start the support intake before buying a block so we can check the purchase record and any applicable coverage first.

One-time technical support

2 options

Buy a block of remote time for troubleshooting and diagnosis. Billed in 30-minute increments.

Ongoing coverage

1 option

Annual coverage for one applicable register or system, during normal support hours.

What to send us so the session is productive

Exact SAM4S modelFrom the identification label, not just the family name.
Support or programmingIs something broken, or does something need changing?
What is happeningThe exact error text, or the specific change you need made.
Does it currently operate?Whether the register powers on and rings a sale at all.
Existing support plan?Whether you already have an active agreement with us.
Where it came fromUseful context only. Buying elsewhere does not exclude you.

Add these details in the notes at checkout, or send them first if you would rather we confirm the work is possible before you pay.

Support hours Monday to Friday, 9:00 AM–5:00 PM Eastern, excluding holidays. We do not offer or advertise 24/7 support.
Not everything can be fixed remotely Some faults are mechanical or need parts. If remote work will not solve it, we will say so rather than bill for time.
Programming is separate Programming is a distinct service from troubleshooting, and is not automatically included in a support plan.
Needing help more than occasionally? If you expect several sessions in a year, an annual support plan may work out more economical than buying individual blocks of time. Compare the plan against what you are likely to use — it is not the right answer for everyone.

The complete checkout, not just the box

Register, programming, accessories and payments from one team.

Most counters do not fail because the register was wrong. They fail because the register, the programming, the peripherals and the payment terminal were bought separately and never checked against each other. We can quote the whole thing as one setup.

  1. Cash register
  2. Professional programming
  3. Accessories and supplies
  4. Integrated payments

Already have a SAM4s?

You do not need a new register to look at payments. Tell us the exact model and how you take cards today, and we will find out whether your current register can be connected to integrated payment processing. Whether it can depends on the model, interface, firmware and programme, so we check rather than assume.

Ask about your current register →

Programmes we can review

  • Interchange-plus
  • Flat-rate
  • ERR pricing
  • Cash discount
  • Dual pricing
  • PIN debit
  • EBT
  • Statement analysis
  • Contract buyout review
  • Equipment programmes

Processing programmes, pricing, equipment and merchant approval are subject to underwriting and written agreement terms. Programme availability and requirements vary, and nothing here is an offer, a quote or a guarantee of approval or savings. You can buy any register, package, accessory, support or programming from us without changing payment processors.

Ready for the next step?

Turn this information into the right cash-register setup.

Use the Register Finder if you are still narrowing down equipment, or talk with a specialist about the register, programming, replacement equipment and accessories that fit your business.